Project Executed & Delivered
We have completed and delivered various projects for reputable industries
| S/NO | DESCRIPTION | CLIENT |
| 1 | ENGINEERING, PROCUREMENT, CONSTRUCTION CONTRACT FOR THE UPGRADE OF 10MMSCFD PRMS | BELT & ROADS INDUSTRIAL PARK/NGMC |
| 2 | STATUTORY INSPECTION AND PRESSURE TESTING OF THREE (3NOS.) VESSEL AT OLORUNSOGO METERING STATION IN ASSET WEST | NGC |
| 3 | REPAIR OF VANDALIIZED SPOT ON THE 6” SEGMENT OF THE NGC & SPDC OGUNU PIPELINE SYSTEM IN DELTA STATE | NGC |
| 4 | GAS SUPPLY TO HWANI INDUSTRY LIMITED, ITORI, OGUN STATE | HWANI/NGMC |
| 5 | GAS SUPPLY TO MATE INDUSTRY LIMITED, ITORI, OGUN STATE | MATE INDUSTRY/NGMC |
| 6 | CONSTRUCTION OF 900M X 6M FLEXIBLE PAVEMENT (ASPHATIC ROAD), BESIDE OBEN-GEREGU/AJAOKUTA GAS PIPELINE ROW BETWEEN KP 143+600 TO KP 144+600, FUGAR, EDO STATE | NGC |
| 7 | CONSTRUCTION OF 10” X 15KM & 6” X15KM EFE PIPELINE EVACUATION PROJECT | NEWCROSS PETROLEUM |
| 8 | CONSTRUCTION OF ONE STOREY BUILDING AT NGC HEADQUARTERS, WARRI | NGC |
| 9 | FABRICATION, INSTALLATION AND PRECOMMISSIONING OF 210MMSCFD GAS PRESSURE REDUCTION AND METERING FACILITY ON THE 36” LEKKI GAS PIPELINE PROJECT FOR DANGOTE FERTILIZER PLANT, IBEJU LEKKI | DANGOTE/ZAKHEM |
| 10 | PROVISION OF SAND BLASTING AND PAINTING SERVICES AT DANGOTE FERTILIZER PLANT, IBEJU LEKKI | DANGOTE/ZAKHEM |
| 11 | CONSTRUCTION OF 4” X 3KM GAS | QSL GAS AND POWER |
| SUPPLY TO RONTAI FACTORY, BENIN CITY | LIMITED | |
| 12 | PROVISION OF EROSION REMEDIATION WORKS ON THE 24”X196”KM OBEN- AJAOKUTA AND 36”X196KM OBENGEREGU PIPELINES RIGHT OF WAY (ROW) FROM KP 146+000 TO KP 147+000 (LOT III) | NNPC |
| 13 | CONSTRUCTION OF DOME 3 OFFICE BUILDING AT NGC HEADQUARTERS, WARRI | NGC |
| 14 | PROVISION OF PREPAID METERING SOLUTIONS FOR 3MMSCFD CONTEC GLOBAL, 3MMSCFD SPECIALTY PULP & PAPER, 2MMSCFD NESTLE AND 1MMSCFD OLAM METERING STATIONS | NGMC |
| 15 | CONSTRUCTION WORKS FOR GAS SUPPLY TO THE BELT AND ROAD INDUSTRIAL PARK LIMITED, ITORI | GIOSAM/NGMC |
| 16 | EMERGENCY ONLINE REPAIR OF LEAK SPOT ON THE 24” OBEN-UGBEGUN GAS PIPELINE SYSTEM AT KP73+400 OGWA EDO STATE | NGC |
| 17 | EMERGENCY REPAIR ON THE LEAKING SEGMENT ON THE 36” ELP-C GAS PIPELINE SYSTEM AT KP 95 IN UTEKON VILLAGE BENIN IN EDO STATE | NGC |
| 18 | GULLY EROSION WORKS ALONG OBENUGBEGUN PIPELINE ROW KP42+375 TO KP43+375 IN ASSET MANAGEMENT MIDWEST | NGC |
| 19 | CONSTRUCTION OF 16” X 29KM GAS SUPPLY TO BUA CEMENT FACTORY, OKPELLA | BUA/NGC |
| 20 | MECHANICAL CLEARING OF PIPELINE RIGHT OF WAY FROM KP 331 TO 316 AND FROM KP 286 TO KP254 | NGC/SOLOMON FILIUS |
| 21 | PROVISION AND INSTALLATION OF 1 NO. 8” CLASS 600 ACTUATOR, MODIFICATION OF 6” CLASS 600 KICKER LINE VALVE AND SERVICING OF PIG LAUNCHER BARREL DOOR AT ESCRAVOS BEACH & 1 NO. 2” CLASS 600 PIG SIGNALLER VALVE AT ESCRAVOS NODE | NGPTC/SAFETY 2000 |
| 22 | ONLINE REINFORCEMENT OF REPAIRED LEAK POINT ON 36” OBEN-AJAOKUTA GAS PIPELINE BETWEEN KP 55 AND 56 IN EDO STATE. | NGC |
| 23 | INTEGRITY ASSESSMENT (FLUSHING, CLEANING, HYDROTEST, DRYING AND NITROGEN PURGING) OF THE ESCRAVOS BEACH COMPRESSOR STATIONESCRAVOS NODE (8”x5.8KM) GAS PIPELINE SEGMENT | NGPTC/SAFETY 2000 |
| 24 | ONLINE REINFORCEMENT OF REPAIRED LEAK POINT ON 36” OBEN-AJAOKUTA GAS PIPELINE BETWEEN KP55 AND KP 56 IN EDO STATE | NGC |
| 25 | DESIGN, PROCUREMENT AND CONSTRUCTION OF CATHODIC PROTECTION SYSTEM FOR 6”x3.9KM FLOWLINE. | PANOCEAN/AMSEK |
| 26 | FLUSHING, HYDROTESTING, DRYING & LEAK TESTING/NITROGEN PURGING OF 6”x0.2KM SPOOLS AT ALAOJI METERING STATION | NEST OIL/G.C. LTD |
| 27 | FLUSHING, HYDROTESTING, DRYING & LEAK TESTING/NITROGEN PURGING OF 16”, 8”, 6”, 4” & 2”, SPOOLS AT ABA LETDOWN STATION | NESTOIL/G.C LTD |
| 28. | FLUSHING, PIGGING, PRESSURE TESTING, DEWATERING, DRYING AND NITROGEN PURGING OF 16”x 1KM NPP GAS SUPPLY AT OGORODE, SAPELE | KAZTEC/TORCH `ENERGY SERVICES LTD |
| 29 | ASBUILT DRAWING OF BATAN FLOW STATION UPGRADE | SPDC/AMSEK |
| 30 | FLUSHING, PIGGING, HYDROTESTING, DRYING & LEAK TESTING/NITROGEN PURGING OF 6”, 4”, & 2” SPOOLS FOR THE CONTAINERIZATION OF PRMS AT OMOTOSHO METERING STATION | NGC/G.C. LTD |
| 31 | CONSTRUCTION OF 2” x 0.15KM GAS PIPELINE AND PRESSURE REGULATING FACILITIES TO 500KVA GAS POWERED GEN SET AT NGC HEADQUARTERS | NGC/AMTECH |
| 32. | REHABILITATION OF PLATFORM B ALONG ALAKIRI ONNES 14” GAS PIPELINE | NGC/FULHAM SERVICES LTD |
| 33 | DESIGN OF SOLAR CATHODIC PROTECTION SYSTEM AT KP254 ALONG 36” ESCRAVOS – LAGOS PIPELINE | NGC/CATROGIC |
| 34 | DESIGN, PROCUREMENT AND CONSTRUCTION SOLAR CATHODIC PROTECTION SYSTEM AT KP 195 ALONG 36” ESCRAVOS-LAGOS PIPELINE | NGC/FULHAM SERVICES LTD |
| 35. | MANUFACTURE AND SUPPLY 106Nos. 6” HALF SHELL ALUMINIUM BRACELET OFFSHORE ANODES | VANDREZZER/OANDO |
| 36 | PROVISION OF UT AND ALLIED INSPECTION OF PLANT AND MANIFOLD PIPPING AT JISIKE FACILITY, IZOMBE, IMO STATE | SEPLAT/SAVIC |
| 37. | EROSION CONTROL WORKS ON ESCRAVOS-LAGOS GAS PIPELINES (ELPS) AT KP331 IN ASSET MANAGEMENT WEST | NGC |
| 38 | PROCUREMENT AND INSTALLATION OF 100KVA 33/415V TRANSFORMER AND 60KVA GAS GENERATOR AT EKHA-AGRO METERING STATION | NGMC |
| 39 | ENGINEERING DESIGN FOR GAS SUPPLY TO 2 x 500KVA GENERATOR AT AZAMA AND TEBIJOR COMMUNITIES IN GBARAMATU KINGDOM, DELTA STATE. | NGPTC/FENOG |
| 40 | CONSTRUCTION OF 36” PIPELINE INCLUDING ROCK DRILLING AND BLASTING ALONG ESCRAVOS-LAGOS 36” GAS PIPELINE 50KM, AND 5KM SECTION FROM OMOTOSHO TO J4 | BRADAMA/ZAKHEM |
| 41 | RE-SURFACING OF TGS ACCESS ROAD WITH ASPHATIC CONCRETE | NGC |
| 42 | PAINTING OF SAPELE METERING STATION | VANDREZZER/OANDO |
| 43. | EXTENSION OF FIRE HYDRANT SYSTEM AT NGC HQT METERING STATION AREA 1 | NGC |
| 44 | EPCIC OF GAS SUPPLY TO GREEN HILLS AGRIC PRODUCTS LTD. | QSL GAS & POWER LTD |
| 45 | STEAM BLOW PIPING | DANGOTE |
| 46 | SPURLINE CONSTRUCTION TO SUPERFINE INDUSTRIAL LTD | AXXELA |
| 47 | SPURLINE CONSTRUCTION TO RACK CENTRE PROJECT. | AXXELA |
| 48 | CONSTRUCTION OF HORIZONTAL CYLINDRICAL TANK | GEOMUD |